11/1/2022 0 Comments Project eve platform![]() ![]() The full EIS was commissioned by EVE and carried out by AZTI-Tecnalia in December 2008. In this case, the consultation process included key stakeholders, such as fishermen guilds (cofradias) and environmental NGOs, amongst others.Ī preliminary Environmental Impact Study (EIS) of the BiMEP Project was undertaken in July 2008 by AZTI-Tecnalia. Consultation with stakeholders, which is to be carried out by General Directorate for Environmental Quality and Evaluation of the Spanish Ministry for Environment, Rural and Marine Affairs. planning, construction, operation and abandonment), b) potential environmental impacts of the project, c) mitigation and corrective measures/strategies to offset the potential negative environmental impacts, and d) an Environmental Monitoring Plan of the project. Submission of an environmental analysis document, covering the following aspects: a) actions that may cause environmental impacts throughout the different stages of the project (i.e. Project submission, including the objective, description and location of the project ![]() In order for the Ministry to make an informed decision on whether or not an Environmental Impact Assessment was needed, three documents/steps were required: Step 1: in accordance with Article 16 of Royal Decree 1/2008, the Promoter (EVE) initiated the environmental procedure in 2008.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |